Join ABB and work in a team that is dedicated to creating a future where innovative digital technologies allow greater access to cleaner energy.
The High Voltage Direct Current (HVDC) System Development department is responsible for developments of electrical system design of HVDC plants. Rating and specification of high voltage equipment, definition of concepts for control and protection design as well as system studies are part of the scope of work.
Project timeline
1. Literature background on VSC MMC and HVDC (2 weeks);
2. Familiarizing with the open PSCAD model of an HVDC system (2 weeks);
3. Formulating a list of features needed (2 weeks);
4. Implementation of the features (6 weeks);
5. Simulating the transients and comparison against a full model (4 weeks);
6. Document the work (4 weeks).